1 / 5
| Assembly Line | 1. Line:automatic,PLC control system,2 rows aging line,8 sets pallet stopper. Four sections stops by QX-4 pallet stopper. Pallet-In stops by QX-2 pallet stopper. | Support Fram | 2. 50 *50 aluminum,guiderail aluminum only,three speed chain,galvanized air pipe. Line equipping with rapid joint with Y shape (50 *50 aluminum, guiderail aluminum only) |
| Motor of Assembly Line | 3. 2 HP,1:100 gear reducer motor,total 8 sets.B1 and B2 adopts 0.5 HP,1:80 motor,total 2 sets. | Moving Table | 4. Moving Table adopts MGPM63-50.Equipping with motor 90 w,1:30 gear box,Chuanming brand. |
| Conductive Frame | 5. Condutive fram made of aluminum.Shrouding plate in 1.5mm thick,coating treatment. | Conductive Guide Rail | 6. Condutive guiderail made of aluminum alloy coating with plastic. Note: 1.Each pallet equipped with 2 sockets with 2 seats in 3 holes. 2.Pallet stopper all automatic. |
| Electric Box | 7. Electric Box:Adopts Japan brand Mitsubishi,PLC control. | Static Wire | 8. Static Wire:4 m2,equipped in the foot of all line.Conveying belt device adopts 5mm thick, antic skidding belt. Conveying axle adopts A3 plate, conveying wheel adopts rubber with wheels. |
| Pallet Stopper | 9. Pallet Stopper:QX-2 stopper on steel plate in 3 mm thick. Foot valve control,total 42 sets. | Foot Valve | 10. Foot Valve:Each workstation equipped with a foot valve |
| Motor of Moving Table | 11. Motor of Moving Table:90 w motor,1:30 gear box.Total 8 sets of moving device | Stroke Switch | 12. Stroke Switch:OMRON brand |
| Shrouding Plate | 13. Shrouding Plate:1.5 Y steel plate.Static coatin | ||













A: This machine size is L20000*W850*H900-2000mm. This can be customized according to your output and workshop layout.
A: This machine can make all sizes of the motor.
A: Generally, our warranty period is one year.
A: This machine is made of aluminum alloy and carbon steel.
A: We can prepare more accessories along with the assembly line, once the accessories broken, can replace it asap.
A: We can set out our installation team until installation finished.